Drawing guide

Fire safety drafting: a practical guide.

Fire safety drawings sit between the building and the people responsible for it. An evacuation diagram tells an occupant which way to walk and which way not to. A block plan tells a firefighter, a maintenance technician or a certifier which zone, valve or pump they are looking at, and where it physically is. When either drawing is out of date, the building is being managed on guesswork.

This guide explains what each common drawing type must show, who relies on it, and what a drafter needs from you to produce one accurately. It covers evacuation diagrams prepared with reference to AS 3745-2010, zone block plans keyed to a fire indicator panel, and hydrant and sprinkler block plans for Class 2 to 9 buildings, short-stay accommodation and commercial tenancies.

Evacuation diagrams

Evacuation diagrams under AS 3745-2010

What a compliant evacuation diagram shows, where it must be displayed, and when it has to be replaced.

An evacuation diagram is a drawn plan of a floor or building that shows the route from any point on that floor to a place of safety. Prepared with reference to AS 3745-2010, it shows the exits, the path of travel to them, the location of firefighting equipment and manual call points, the assembly area, and a clear you-are-here position marker. Emergency contact numbers and brief instructions usually sit alongside the plan.

Diagrams are used wherever occupants need guidance to evacuate: Class 2 to 9 buildings, short-stay accommodation such as Airbnbs and holiday rentals, and workplaces with an evacuation plan. They are displayed where they can be read on the way out, typically at each entry and in corridors, and they must reflect the building as it stands today.

If a wall moves, a room changes use or a new unit is added, the diagram on the wall stops being accurate. A drawing date and revision note on the sheet are the first things an inspector looks at, so revision control matters as much as the drawing itself.

Block plans

Zone block plans and the fire indicator panel

How detection zones are numbered, drawn and kept in step with the panel.

A zone block plan is the map that sits beside a fire indicator panel. It shows the building in plan, divides it into the detection zones the panel reports, and labels every zone to match the panel exactly. Without it, a zone in alarm sends a responder to a building with no idea which floor or wing has triggered.

The plan shows the panel location, the zones it monitors, and the equipment each zone covers, including smoke and heat detectors, sprinkler flow switches, tamper switches and manual call points. Zones are drawn and numbered consistently, with a legend that explains any colour coding used on the sheet.

Block plans go out of date quietly. An added tenancy, a relocated panel or a re-zoned floor all break the match between the plan and the panel. Updating the plan after any alteration is what keeps the drawing useful, and it is usually the item a maintenance contractor raises first.

Block plans

Hydrant and sprinkler block plans

What hydrant, booster and sprinkler block plans must show for maintenance and emergency response.

Hydrant and sprinkler block plans document the parts of a fire system that are invisible until they are needed: the pipework, valves, pumps and tanks behind the wall. With reference to AS 2419.1 for hydrant systems and AS 2118.1 for sprinkler systems, they show the hydrant and booster locations, isolation and control valves, pump sets, tanks and the areas each part of the system protects.

These drawings serve two audiences. Firefighters use them to find the booster and the isolation valves under pressure. Maintenance contractors use them to identify control valve assemblies, test points and the extent of coverage during inspection and testing.

A hydrant plan is only as good as its as-installed accuracy. When pipework is altered during a fitout, or when a pump or valve is replaced, the plan needs the same revision. Updates are typically issued as as-installed drawings with a clear revision table, so the maintenance file holds one current sheet rather than three contradictory ones.

What to send us

You do not need a tidy set of documents to start. Anything that shows the layout and the system is enough for a quote.

  • Floor plans, even an old architectural set
  • Site photos of the panel, hydrants or valves
  • A previous diagram or block plan to revise
  • The system type and any zone or equipment lists
  • Building address, levels and occupancy type
  • Where the finished drawings will be displayed