A drafting studio built around fire safety documentation.
PlanPoint prepares evacuation diagrams and fire system block plans for buildings across Australia. We are based in Sydney, we work remotely, and every drawing we issue is built from the plans, system information or site photos you send us.
What we do
A fire safety drawing has a small footprint and a large job. It tells a stranger where the exits are, which zone a detector sits in, or which valve shuts down a sprinkler system under pressure. That is the work we do: evacuation diagrams drawn to AS 3745-2010, zone block plans keyed to the fire indicator panel, hydrant and booster plans, and sprinkler block plans showing control valves and coverage.
Most projects start with something imperfect. A set of architectural PDFs from an earlier renovation, a phone photo of the panel, a hand-marked plan left by a maintenance contractor. We work with what exists, confirm the gaps with you, and produce a clean, print-ready sheet with a consistent legend, lineweight and title block. As-built revisions and inspection mark-ups are handled in the same way, so the drawing never drifts away from the building.
Who we work with
- Property owners and managers running short-stay accommodation, holiday rentals and lodges
- Fire protection companies and maintenance contractors keeping block plans current
- Builders, certifiers and facility managers working through an upgrade, a fire safety order or a change of use
- Drafting and consulting studios needing extra drawing capacity
Who builds it
PlanPoint is a small studio, and that is deliberate. The person who quotes your project is the person who draws it. Questions about zone numbering, sign placement or whether an assembly area belongs on the sheet are answered by the drafter, rather than relayed through an account manager. Drawings are checked before they leave, issued as PDF and DWG, and kept on file so the next revision starts from the last set rather than from scratch.
- Drawings prepared to AS 3745-2010 and NCC 2022 Vol One
- DWG, PDF and print-ready artwork delivered
- Direct contact with certifiers, fire services and installers
- Revision-controlled drawing register on every project
Standards we draw to
Drawings are prepared with reference to the following standards, where they apply to the building and the system being documented.
- AS 3745-2010
- NCC 2022 Vol One
- AS 1851
- AS 2118.1
- AS 2419.1
- AS 1670.1
- AS 2444